© 2010 Landmark Surveys: Survey Crew. All Rights Reserved.
About Us
Murray C Roddis
Senior Party Chief and President of Landmark Surveys Ltd:
Murray founded Landmark Surveys Ltd, July, 1994 after 14 years as an employee of Alberta Transportation in November, 1994. Since his first contract to supply surveying services directly to Alberta Transportation on a grading project west of Rimbey, Murray has completed countless surveys and has personally accumulated more than 22,000 hours of invoiced RTK GPS/GNSS experience. His extensive experience of more than 29 years has come from services he performed on projects ranging from complex interchanges, highways, plant sites, mine sites and some legal surveys (under the direction of an Alberta Land Surveyor). He has provided services on these projects in the capacity of preliminary survey engineering, construction survey engineering and as-built / final detail surveys for the purposes of quantities calculations.

Survey Crew

Justin Kologie
Party Chief
Initially Justin started out in the oil field as a rig hand but for the past 4 years he has been involved in different aspects of the construction industry. Justin has completed a three year engineering technology program from Red River Community College, Winnipeg, Manitoba. He has experience in geo-technical work for quality control in both municipal and residential areas. Over the past years he has been employed as a civil technologist. From here he has gained further experience in project management, drafting, design, surveying, cost estimates, and working with multiple contractors on multiple sites. He brings both knowledge and experience to LSL from his close, hands on involvement with field work.
PROJECT EXPERIENCE

- Hwy 54:08 By Pass, Innisfail, AB Grading, Base, Paving Construction Survey – GNSS/VX (2009)
- Speaker, Trimble Dimensions 2009 – Las Vegas, NV, USA – GNSS/VX (2009)
- North Highway Connector NE 6-Lane Ring Road, Red Deer, AB Preliminary Survey GNSS/VX (2008 - )
- Precision Drilling Site Grading and Construction, Red Deer, AB – GNSS/VX (2008)
- Shell Chemicals Railway Expansion, Fort Saskatchewan, AB Preliminary Survey – GNSS/VX (2008)
- County of Red Deer Stockpile Inventory – GPS/VX (2007)
- Speaker, Trimble Dimensions 2007 – Las Vegas, NV, USA – VX (2007)
- North Innisfail Interchange Earthworks Grading and Construction Survey – GPS/VX (2007)
- Shell Scotford Upgrader Railway Expansion and Local Road Preliminary Survey – GPS/VX (2007)
- Clearview Industrial Subdivision Grading and Construction Survey– GPS (2006/2007)
- Enbridge Cheecham Pond Reconstruction Construction Survey– GPS (2006)
- Enbridge Early-Warning Densometer Preliminary and Construction Survey – GPS (2006)
- Enbridge Cheecham Pile Placement Layout Survey – GPS (2006)
- CNRL Horizon Roads, Pads and Ponds Grading and Construction Survey – GPS (2005)
- Grande Cache Coal 7 Mine Haul Road & Portal Grading and Construction Survey with pre-shear and production
blasting in extremely rugged terrain – GPS (2004)
- Various Pipeline And Well site Legal Surveys – GPS/TS (Dec 2003 – Feb 2004)
- Beta Field Tested the Federal Canadian Differential Corrections service – CDGPS (May – Aug 2003)
- Alberta Transportation Bridge Inspection Management (BIMS) GIS – DGPS coordination
- BIMS – North Central Region (2000-2003)
- Alberta Transportation Bridge Inspection Management (BIMS) GIS – DGPS coordination
- BIMS – Southern Region (2000-2003)
- Fluor Long Lake Upgrader Project – topographic survey – GPS (2002)
- Highway 21:28 & 16 Interchange – preliminary survey for bridge replacements & twinning - GPS/TS (2001/2002)
- Anthony Henday Drive Sewer Line – construction stakeout – GPS (2001)
- Highway 40:22 at Brazeau River – preliminary survey for bridge replacement – GPS/TS (2001)
- Anthony Henday Drive & 111St Interchange Extension – GPS/TS (2001)
- Highway 21:28 & CNR Overpass – preliminary survey for bridge replacement – GPS/TS (2001)
- Anthony Henday Drive – bridge placement surveys – GPS/TSM (2001)
- Arial Laser Imaging – reference control surveys – GPS (2000)
- Heartland Orchards – Agricultural GIS Survey, Design and Stakeout – GPS (2000)
- Hwy 32:10 – legal control surveys – GPS (2000)
- Flood Creek Ash Disposal Site, Smokey River Coal – intermediate topographic survey - GPS (2000)
- Country Hills Bvd & Deerfoot Trail Interchange – preliminary survey for bridge replacement and twinning – GPS/TS (2000)
- Highway 63:12/14 - functional planning profiles north of Fort McMurray - GPS (1998/1999)
- Highway 43:12/14 - preliminary survey for bridge replacements and twinning - GPS/TS (1998)
- Highways 12 & 64 - geometric assessment surveys - GPS (1997)
- Highway 16X & SH 779 Interchange - preliminary and construction stakeout survey - GPS/TS (1997)
- Highway 88:10 & :12 - construction survey for grading - GPS/TS (1996/1997)
- Highway 4:02 – preliminary survey for twinning - GPS/TS (1996)
- Mapping and volume surveys of stockpile sites in the Central Region - GPS/TS (1994/1995)
- Roadway Planning Branch - Control, AT&U - provided 3rd order control for Mapping - T2 (1989/1990)
- Highway 51 Eckville to Leslieville - surveys for asphalt stabilized base course - T/L (1986)
- Highway 11X and 20X - construction survey for asphalt stabilized base course - T/L (1985)
- Highway 22 north of Highway 13 - construction survey for asphalt stabilized base course - T/L (1984)
- Red Deer River Access Road - preliminary, bridge and construction survey on a grading project with pre-shear and
production blasting in very rugged terrain - T/L (1980 - 1985)