View our current list of civil engineering projects here. Our "survey crew for hire" services are utilized by both government and private agencies. We provide a high level of workmanship and utilize the latest and most innovative surveying tools such as the first Trimble FX 3D Laser Scanner sold in Canada, the Trimble VX Spatial Station, and the Trimble R8-3 GNSS Rover systems.  In addition, Landmark Surveys Ltd is the first in Canada to utilize the Trimble Connected Community Technology for remote observation and transfer of data to / from the head/field offices.

- (2:24) Old Pole Road Flyover KM 8.25 to provide all the survey services to facilitate the preliminary,
construction, and final phases of this project (2008 to 2011)

- (2:24) Highway 2 Interchange Improvements at Gaetz Avenue / Taylor Drive / Gasoline Alley (CE081/09) including 11 KM of 8-lane freeway and 5 new bridges.  To provide all the survey services to facilitate the preliminary, construction, and final phases of this
project (2009 - 2014)

- SH 761 Realignment and Upgrade, Buck Lake, Alberta, (5 kms) to provide survey services to facilitate the
construction, and final phases of this project (2010)

- Truck Pit Road, MD of Wainwright; 14kms of local road upgrading to heavy truck status to provide all the
survey services to facilitate the preliminary, construction, and final phases of this project (2010)

- Raven River Bridge Replacement and Realignment of Local Road near the hamlet of Raven, AB. Bridge Survey and Grading survey services (2010)

- Near Cremona, AB Bridge Replacement survey on local road (2010)

- Near Millet, AB Bridge Replacement survey on local road (2010)

- Supernet placement survey for Directional Boring (2010)

- SH 616, near Hay Lakes, AB; 14 km ASBC baseline, superelevation stakes, as well as Grading, Rip Stakes, Spread Nails / Stakes and Trim Stakes (2010)

- Home Hardware As-Built for expansion utilizing the Highly Precise Trimble FX 3D Laser Scanner (2010)

- 400 KM Hydo in Hanna District; Preliminary Profiling and Substation As-Builts  (2010)

- Hwy 2A Municipal Upgrade to 4 lane, Town of Lacombe, Alberta to provide survey services to facilitate
the construction, and final phases of this project (2011-2012)